Flash Charge EV charging station operating at night in Kerala
Kerala · EV Charging

EV charging stations in Kerala —
you own it, we run it.

We manufacture the chargers in Aluva, build your station, and operate it under the Flash Charge brand — so the site stays live, monitored and earning while you own the asset.

Plan my station EV charging overviewCharging stations
Why Kerala

Built in Kerala, for Kerala.

Our R&D and production lines are in Aluva, Ernakulam — which means the charger at your site is designed, built and serviced by the same company. When a unit needs attention, spare parts and engineers come from within the state, not from an importer's queue overseas.

Kerala's EV adoption is concentrated along the NH-544 and NH-66 corridors and around Kochi, Thrissur, Kozhikode and Thiruvananthapuram. We size each station to its actual traffic and available grid supply rather than selling a fixed package.

Local manufacturing

Chargers built in Aluva — real spare-part availability and fast service.

Grid-limited sites

Our Vector Series delivers up to 90 kW from an 11–30 kW supply, avoiding costly upgrades.

Highway & town sites

Station sizing matched to NH corridor traffic or local footfall.

Backed by 2+ GWh

Delivered across our operating Flash Charge network.

The model

You own the asset. We operate it.

You purchase and own the station. Alongside the sale we sign an operational agreement: the entire charging revenue is credited to Automation Gallery, we meet the running costs and handle maintenance, and the profit is settled to you monthly with a transparent revenue-and-expense statement.

Because we manufacture the hardware and run the network, uptime is our responsibility, not a third party's. Every session is monitored over IoT, with fault alerts and remote diagnostics so problems are found before a driver does.

We build

Charger, enclosure, branding, civil work and grid connection — commissioned end to end.

We operate

Listed on the Flash Charge app with payments, wallet and slot booking.

We maintain

24/7 monitoring, field service and least-possible downtime.

You earn

Monthly statement and settlement — nothing hidden.

Suitable sites

Where a Kerala station works best.

The strongest performing sites combine passing EV traffic with a reason to stop for 20–40 minutes. We will tell you honestly if a site is not viable rather than sell you a charger that will sit idle.

Hotels & resorts

Backwater and hill-station properties where guests stay overnight.

Highway stops

Restaurants and fuel forecourts on NH-544 / NH-66.

Malls & retail

Where dwell time already exists.

Apartments & villas

Residential communities with resident EV owners.

Beyond Kerala

Kerala is our base — India is our footprint.

Kerala is where we manufacture and where our engineering team sits, but we deploy and operate stations across India, and through our Abu Dhabi office across the UAE. Our Flash Charge network has delivered over 2 GWh of charging energy to date.

If your site is outside Kerala, the model is identical — we supply the hardware we build, commission the station, and operate it under the same agreement with monitoring and monthly settlement. Talk to us about EV charging in the UAE or see our India-wide charger manufacturing.

Kerala

Manufacturing, engineering and our densest station network.

Across India

Supply, commissioning and operations nationwide.

UAE

Delivered from our Masdar City, Abu Dhabi office.

One agreement

Same build-operate-share model wherever the site is.

FAQ

EV charging stations in Kerala — common questions

How much does an EV charging station cost in Kerala?

Cost depends on charger capacity (we supply 3.5 kW AC up to 240 kW DC), civil work, and your grid connection. We provide an itemised proposal after a site survey rather than a headline figure, because grid availability changes the cost significantly.

Do I need a grid upgrade for a fast charger?

Often not. Our Vector Series is a battery-backed DC charger that delivers up to 90 kW from an 11–30 kW supply and keeps charging through a power cut — avoiding a transformer upgrade and the associated KSEB paperwork and waiting time.

Who handles maintenance and breakdowns?

We do. We manufacture the chargers, monitor every station 24/7 over IoT, and run our own field service team. Fault alerts reach us before most site owners notice an issue.

How do I receive the income?

All charging revenue is credited to Automation Gallery. We meet the operating expenses and maintenance, then settle your profit share monthly along with a revenue-and-expense statement.

Can I get a bank loan for the station?

Yes — stations are financed as income-generating assets. We provide the detailed proposal, technical specifications and the operations agreement that banks ask for during appraisal.

How long does commissioning take?

Typically a few weeks after site finalisation and grid approval. The variable is usually the electricity connection, not the hardware, since we manufacture the chargers ourselves.

Do you install charging stations outside Kerala?

Yes. Kerala is our manufacturing and engineering base, but we supply, commission and operate stations across India, and across the UAE through our Abu Dhabi office.

Thinking about a charging station in Kerala?

Send us the location and we will assess the site, the grid supply and the realistic earning potential.

📅 Book a consultation
WhatsApp us